|
Re: Can anyone read Japanese?
Zetsuen Shiken Ki (Isolation Test Unit)
Murakami Denki Kojo (Murakami Electrical Factory)
Tokyo
Instructions for Use
1. Preparation for the Test:
Place the unit on a level and sturdy surface. Turn the handle quickly (120 turns per minute) to maintain steady electrical charge.
2. Isolation Test:
a. In order to test isolation between the circuit and ground, the lead from the circuit should be attached to the socket marked "Live". The ground lead should be attached to the socket marked "Earth".
b..
3. Prevention of Electrical Leakage(?) on the Surface of the Unit
...
|