Re: Question about Bf 109K-4

I don't have any costs for the 109K, but here are the "Fertigungsmittelkosten" (Assembly costs [?]) for the 109G. At a rate of 200 a/c per month: Fuselage: 1,950 hours, Control surfaces: 1,050 hours; Wings: 3,000 hours; Powerplant: 500 hours; Total: 6,500 hours. At a rate of 50 a/c, the cost rose to 9,200 hours; and, at a rate of 500 a/c per month, the cost dropped to 3,800 hours. This was from a report of 11.5.44.