|
Re: new research - readiness state, losses and logistics
Andreas - more specifically say a 109 based at Salzwedel was deemed 40% damaged, theoretically repairable, but not repairable at Salzwedel - requiring transportation to another site.
a.) was it then stricken from the assigned fighter unit, b.) assigned into category 'out of service - but not possible to service locally' and c.) Logged out of Salzwedel inventory to repair facility 'ABC',transported to ABC depot where it was received and logged into a category 'damaged-received from Salzwedel', d.) tracked by Werkno as WIP until repaired, and e.) logged into another category 'repaired/ready for assignment, f.) Shipped to 'XYZ" unit, g.) logged by 'XYZ' as a 'new inventory item-ready for duty>
|