|
Re: Servicing a Pratt & Whitney R-1830 in RAF
Not sure if I got this right but here goes.....
The attachment if from the Operators Handbook for the Twin Wasp C4 Engine as published by Pratt & Whitney Aircraft of which I have a copy.
Apart from the list of work to be done which covers a periodic inspection of 50 to 75 hours of operation there is more detailed instruction for each section.....
My father was a Fight Engineer on 120 Squadron operating with the B-24 Liberator.
|