Quote:
Originally Posted by Merlin
All Ju 87 in the range 4901xx to 4942xx were build at WFG Lemwerder from April to July 1944 in the G-2 version, they were no conversions.
|
Explain & define. G-2 was subtype. D- was production version.
Adding: G-2 is listed in Umbau from WFG Ju 87 D-3 (Lieferplan 225 / Umbau Jan-to April 44), but listed as D in main production plans (LP-225-227)
but I do not have full set or all versions of them plans for WFG.
Ed