Re: Heinkel He177 Eger-Cheb Production
I think it was possibly only assembly.
Project 1041 was started in late 1936 from Bomber A specification. Led by Technical Director Hertel, but designed by the Gunther brothers. Following eight initial prototypes an total of about 1,153 He 177 A series machines were built by the Arado/Warnemunde factory and the Heinkel at Rostock/Marienehe & Oranienburg factories. Production started in late 1941 and extending to October 1944.
|