Re: Were the Pegasus and Horsa Bridges passable for tanks?

Okay, so - as far as I understand - the Orne bridgehead was reachable for tanks only after the pontoon bridge, code-named London, was completed on 8-9 June, while the Pegasus Bridge was available for tanks much later (preparatory for operation Goodwood in mid-July), only after it was reinforced to Class 40 standard? Am I right?