Luftwaffe and Allied Air Forces Discussion Forum  

Go Back   Luftwaffe and Allied Air Forces Discussion Forum > Discussion > Luftwaffe and Axis Air Forces

Luftwaffe and Axis Air Forces Please use this forum to discuss the German Luftwaffe and the Air Forces of its Allies.

Reply
 
Thread Tools Display Modes
  #101  
Old 9th July 2024, 13:42
AndyMa AndyMa is offline
Senior Member
 
Join Date: Sep 2019
Location: Lincoln UK
Posts: 425
AndyMa is on a distinguished road
Re: Some enlarged and "tweaked" known photos of Ar 234s

Thanks for the clarification Jim.
Reply With Quote
  #102  
Old 10th July 2024, 13:09
Karoband Karoband is offline
Senior Member
 
Join Date: Dec 2014
Posts: 859
Karoband has a spectacular aura aboutKaroband has a spectacular aura about
Re: Some enlarged and "tweaked" known photos of Ar 234s

http://forum.12oclockhigh.net/album....pictureid=1600

120. At the same time as the bomber pilots of Einsatzstaffel 234 were training at Burg, the ground crew of 3. Flughaffenbetriebskompanie (FBK)/76 were learning to service the Arados. One of their most difficult tasks was switching out the Junkers Jumo 004B engines, which weighed 745 kg. (1642 lb.) each.
First the access panels of the engine nacelle had to be removed, the side panels dropped down for access to the securing bolts and, in this case, a special gantry with block and tackle wheeled above the wing.


http://forum.12oclockhigh.net/album....pictureid=1601

121. An angled lifting bracket was brought under the wing to attach to the engine's centre of gravity on both sides.


http://forum.12oclockhigh.net/album....pictureid=1602

122. The J2 hose connection had to be uncoupled as well as the bundle of wires coming from inside the wing.


http://forum.12oclockhigh.net/album....pictureid=1603

123. After the securing bolts were removed, the engine could be carefully manouvered away from the wing.


http://forum.12oclockhigh.net/album....pictureid=1604

124. This photo shows clearly where the lifting bracket hooked at the centre of gravity of the engine.


http://forum.12oclockhigh.net/album....pictureid=1605

125. This is a view of a crane with a motorized winch being used with a different shaped lifting bracket. Again the Arado has the yellow ring of the Einsatzstaffel.


http://forum.12oclockhigh.net/album....pictureid=1606

126. In this case, the bracket is C-shaped but also hooks into points of the centre of gravity.The bundle of wires can be seen.


http://forum.12oclockhigh.net/album....pictureid=1607

127. Once the securing bolts were back in place, the wiring and plumbing could be easily re-connected, and the nacelle panels re-attached.
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +2. The time now is 15:37.


Powered by vBulletin® Version 3.7.2
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004 - 2018, 12oclockhigh.net