Quote:
Originally Posted by Harold Lake
The Bf 109 E-3, W.Nr. 1361, was one of a batch of mostly E-3s with a few E-4s built by Erla late in 1939 and into 1940. After it was selected for modification, it became the V26, and participated in various extended range fighter-bomber tests associated with the new E-7. I understand it was written-off following a crash sometime in August 1940.
Hal
|
- built in the middle/ end of October 1939
- 26.06.1940 relocation from Rechlin to Augsburg
- 03.07.1940 repair in Leipzig on Erla Maschinenwerk GmbH for 24 days, damage low (without percent)
- 03.08.1940 relocation from Augsburg to Rechlin
- 10.08.1940 belly landing without repair