Luftwaffe and Allied Air Forces Discussion Forum  

Go Back   Luftwaffe and Allied Air Forces Discussion Forum > Discussion > Allied and Soviet Air Forces

Allied and Soviet Air Forces Please use this forum to discuss the Air Forces of the Western Allies and the Soviet Union.

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #6  
Old 19th December 2007, 00:52
Graham Boak Graham Boak is offline
Alter Hase
 
Join Date: Jan 2005
Location: Lancashire, UK
Posts: 1,686
Graham Boak is on a distinguished road
Re: Spitfire III - questions

The prefix LF applies to the engine fit, not to the clipped wings. The dimensions quoted are those in STH. They are contradictory, as 3.5 feet off each tip would give a span just under 31ft. Perhaps it should say 30 ft 8in? This is close to Wojtek's 30ft 6in. 30ft 6in is also quoted in the Harleyford Spitfire book, and in Price's Spitfire Story. Given that the Spitfire was built in Imperial units, conversion to metric simply introduces an additional source of error. Perhaps the answer is to draw out the wings and determine which span gives the correct wing area, which appears to be consistently 220 sq ft.

STH does not specifically say what engine was installed for the first flight, but does say that it was delayed because supply of a new DH propellor was delayed. A new propellor suggests a new engine. The reweighing was with a Rotol propellor, which may (or may not) have been sufficent reason. However, the Merlin X is not a standard Spitfire engine anyway. The text here is again contradictory. It talks of the desired engine being the RS 2M (P.127) Merlin XX. P.132 describes the RS 2M as the X, and the RS 3M as the XX.

Perhaps we need a definition of just what a Merlin X was before attempting to judge which of the contradictory statements is an error. The Merlin X was the 2-geared engine in the Halifax Mk.1, rated at only 1130hp for take-off compared with 1175 for the Merlin XII in the Spitfire Mk.II. If so, the performance of any interim Mk.III could only be disappointing, and it is not clear how the figures quoted on P.132 can apply to the aircraft fitted with a Merlin X. Or barely to the Mk.III at all.

A delay for production engines may not imply a delay in delivery of a prototype, but it is an interesting idea.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Thunderbolts and Mustangs versus the Jagdwaffe (split topic) Ruy Horta Allied and Soviet Air Forces 98 9th August 2007 17:22
RAF Hurricane and Spitfire questions 98Phan Allied and Soviet Air Forces 6 4th February 2007 13:28
Losses of B-17's in RCM role paul peters Allied and Soviet Air Forces 4 15th February 2006 21:57
The remarkable William Tex Ash, 24 March '42 Brendan Luftwaffe and Axis Air Forces 3 4th February 2005 19:55
Star of Africa Claims Buz Luftwaffe and Axis Air Forces 5 8th January 2005 13:28


All times are GMT +2. The time now is 01:43.


Powered by vBulletin® Version 3.7.2
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.
Copyright ©2004 - 2018, 12oclockhigh.net